Incorporating cab-signalling into interlocked signalling design with verification
Implementing Organization
Indian Institute of Technology (Kharagpur)
Principal Investigator
Dr. Chittaranjan Mandal
Indian Institute of Technology (Kharagpur)
Project Overview
The objective of this project is to create tools for signal interlocking and enable trains to run at high speeds under adverse conditions, such as foggy conditions. This is a problem faced by the railways and is, therefore, a problem that needs to be satisfactorily addressed. The impact of this technology will be better operation of trains under Indian conditions. The strength of the proposal is that it rests on the experience of developing signal interlocking tools as a proof of concept for South Eastern Railways. This project aims to extend that work and also develop techniques for running trains at high speed under adverse weather conditions. This aspect was not part of the work done earlier. Wireless location determination using a standard wireless communication protocol (GSM-R/LTE/other) and development of algorithms and protocols for exchanging data for location determination and dissemination are tasks identified for cab. As zonal variations exist in the schemes for application logic generation and also RCC generation, techniques will be developed for rule based generation of RCCs and application logic. Verification techniques developed to verify safety aspects of the application logic with respect to the RCC will have to be extended to cover the newer aspects of operation.