CSIR-Central Building Research Institute (CSIR-CBRI), Roorkee
Project Overview
No need no anchorage with surroundings structure, Can be dismantled in to number of sub-assemblies for easy transportation, Can be shifted from one floor to another floor and assembled easily, Hoisting speed; 10 m/min. and 20 m/min, Power requirement; 5HP