Stepwise Repeated D-stabilisation and Stabilisation of Collapsible Soil Mass by "Soil Nailing Technique" used for Construction of Railway/Road Underpasses
Implementing Organization
Central Road Research Institute (CRRI)
Project Overview
For safety and stability in live loading condition for the construction of Underpass without disturbing the live traffic (Railway/Roads)