×

img Acces sibility Controls

Technologies Banner

Engineering Sciences

Hydraulic Transportation of Minerals/Ores/Industrial Wastes

Implementing Organization

Project Overview

A vertical pipe loop test facility consisting of Technology Demonstration5 mm NB and 100 mm NB flexible hose pipes of 20 m long each has been set up to provide basic design data for transportation of sea bed minerals (manganese nodules) from a sea depth of 6 km in slurry form. Horizontal pipe loop test facilities (high concentration and low concentration) has been established in order to transport powdery materials (Ores, Minerals Industrial wastes such as coal ash, red mud etc.) in slurry form at different concentrations and for providing basic design parameters for commercial slurry pipelines. These facilities have been extensively used for providing engineering data to a more than 25 public and private industries for commercial transportation of minerals/ores/industrial waste slurries.
Funding Organization
Funding Organization

Quick Information
Area of Research
Engineering Sciences
Focus Area
Waste Management
Status
1
Output
No. of Research Paper
00
Technologies (If Any)
00
No. of PhD Produced
N/A
Startup (If Any)
00
No. of Patents
Filed :00
Grant :00
arrowtop