Stepwise Repeated D-stabilisation and Stabilisation of Collapsible Soil Mass by "Soil Nailing Technique" used for Construction of Railway/Road Underpasses
Implementing Organization
Central Research Institute (CRI)
Central Road Research Institute (CRRI)
About
For safety and stability in live loading condition for the construction of Underpass without disturbing the live traffic (Railway/Roads)